Well our house is really starting to come along. Last week, my dad met with the contractor to do a framing walk through. They already have the windows and all of the electrical in place and the tile roof was almost finished! The day after the walk through they started putting the dry wall up on the inside of the house and the stucco on the outside of the house! It is so fun to see our future home slowly come together!!
 |
| The front! |
 |
| Back of the house....future location of a patio for lots of BBQs!! |
 |
| View of the kitchen, breakfast nook and future bar/island! |
No comments:
Post a Comment